• 800.732.7442

Representative Survey Projects

Pangborn Memorial Airport Runway 30 Expansion

Establishment of project control utilizing GPS and conventional survey, public records research for documents confirming right of way/private ownership, topographic survey/surface modeling, cadastral survey/section breakdown; substation site boundary determination and staking. Prepare boundary descriptions and exhibit maps for the acquisitions.

Valley Mall parkway Improvements

Design base mapping, right of way determination and right of way/easement acquisition description and exhibit preparation. Project work included GPS control network establishment, boundary/topographic survey/surface modeling and drafting. Consulting related to matters of title and public records research/analysis.

Walnut Street Relocation

Project work included establishment of project control utilizing GPS and conventional survey methods, public records research for right of way and private ownership, topographic survey/surface modeling, cadastral survey/section breakdown and substation site boundary determination and staking as well as preparation of boundary descriptions and exhibit maps for.

Wanapum & Pries rapids Photogrammetric Mapping

Complete horizontal and vertical control of the Wanapum Dam Project from Rocky Reach Dam to the Vernita Bridge; Place aerial targets at pre-determined positions in support of conventional aerial photography, LIDAR and infra-red mapping of the project.

Lakeside Trails Topographic Mapping

Conduct topographical survey of approximately 23 acres and resulting mapping of upland park areas, beach area, marina area and offshore-submerged areas of the Don Morse Park and the trail corridor of the Lakeside Trail from Don Morse Park to Lakeside Park in Chelan, WA.