Representative Engineering ProjectsSR97 Intersection DesignResponsible for design and permitting for limited access intersection on SR 97. Intersection has been designed in accordance with WSDOT Standards, intersection will serve 8 lots with 1,200 LF of roadway in Douglas County, WA.
Edgewater Cottage Community Utilities Design
Responsible for design of underground utilities on this high density development located in Douglas County. Serving 56 cottages with 1,800 LF of roadway. Monroe Street ReconstructionTIB road reconstruction project. Design of 2600 LF of roadway including storm drainage, PSE development and public participation in Waterville, Douglas County, WA.
Douglas PUD Recreation Improvement
Selected in as Prime Consultant on design project to provide design services for the repair and upgrades to existing facilities within the Wells Dam Reservoir. Work includes upgrades to parks to improve playgrounds, restrooms, parking docks and boat launches. City of Wenatchee Stormwater Collection System EvaluationPart of team selected to provide engineering services for the hydraulic modeling of the City's stormwater collection system to identify system deficiencies and recommend system improvements.
Sewage Lagoon Reconstruction
Part of team selected to provide engineering services for the reconstruction of the Town's sewage lagoons, assisted in property acquisition for expansion and will be providing construction management services in Mansfield, WA. Corral Creek SubdivisionProvided Surveying and Engineering services for project from initial conception through plat recording. Project included 3,800 LF of roadway, utilities, 60 LF span bridge, and double box culvert for 28 lots in Douglas County, WA.
|





